MOQ: | 1Set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | Within 30 Days |
Payment Method: | L/C, T/T, Western Union, D/P, MoneyGram |
Supply Capacity: | 300 Tons/Month |
High pressure Coal Fired Steam Boiler Components Enamel Tube Air Preheater Wiht Advanced Technology
Product Description
1. A device,which increases the tempurature of air before it supply to the furnance using heat from flue gases passing through chimney.
2. The heat carried with the flue gases coming out of economiser is further utilised for preheating the air before supplying to the combustion chamber.
3. An increase of 20 degree centigrade in the air temp.increases the boiler efficiency by1%.
4. It is a necessary equipment to supply hot air for drying the coal in pulverised fuel systems to facilitate grinding and satisfactory combustion of fuel in the furnace.
Adavantages
1. Preheated air increases combustion rate and then increases steam generations of boiler.
2. Due to higher temp. of air,furnace temp.increases,so low grade coal can be burnt efficiently.
3. Air heated by heat of exhaust gases.It reduces fuel consumptions.Therefore thermal efficiency of boiler increased.
Parameter
Layout item |
Horizontal layout | Vertical layout |
Tube arrangement |
staggered arrangement / in-line arrangement |
staggered arrangement / in-line arrangement |
Sealing of pipe and plate |
Packing heat- resistant material/ welding |
welding |
Anti-wearing |
a,when gas scours external tube, welcoming smoke tubes have protective tile b,when gas scours inside tube,wear casing pipes are installed in gas inlet. |
Workshop
Certifications
Company Information
Fabrication area of 200,000 square meters
150 Engineers
600 Coded welders
60 Licensed Inspectors (including NDT level-lll instructors)
Grade-ALicenses for Design and Manufacture boiler (issued by the State Administration of Quality Supervision and Inspection)
ISO 90001:2008 Quality System
ASME Certificate of Utility Boiler
ASME‘S’ , ‘U’ and NB stamp authorization
MOQ: | 1Set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | Within 30 Days |
Payment Method: | L/C, T/T, Western Union, D/P, MoneyGram |
Supply Capacity: | 300 Tons/Month |
High pressure Coal Fired Steam Boiler Components Enamel Tube Air Preheater Wiht Advanced Technology
Product Description
1. A device,which increases the tempurature of air before it supply to the furnance using heat from flue gases passing through chimney.
2. The heat carried with the flue gases coming out of economiser is further utilised for preheating the air before supplying to the combustion chamber.
3. An increase of 20 degree centigrade in the air temp.increases the boiler efficiency by1%.
4. It is a necessary equipment to supply hot air for drying the coal in pulverised fuel systems to facilitate grinding and satisfactory combustion of fuel in the furnace.
Adavantages
1. Preheated air increases combustion rate and then increases steam generations of boiler.
2. Due to higher temp. of air,furnace temp.increases,so low grade coal can be burnt efficiently.
3. Air heated by heat of exhaust gases.It reduces fuel consumptions.Therefore thermal efficiency of boiler increased.
Parameter
Layout item |
Horizontal layout | Vertical layout |
Tube arrangement |
staggered arrangement / in-line arrangement |
staggered arrangement / in-line arrangement |
Sealing of pipe and plate |
Packing heat- resistant material/ welding |
welding |
Anti-wearing |
a,when gas scours external tube, welcoming smoke tubes have protective tile b,when gas scours inside tube,wear casing pipes are installed in gas inlet. |
Workshop
Certifications
Company Information
Fabrication area of 200,000 square meters
150 Engineers
600 Coded welders
60 Licensed Inspectors (including NDT level-lll instructors)
Grade-ALicenses for Design and Manufacture boiler (issued by the State Administration of Quality Supervision and Inspection)
ISO 90001:2008 Quality System
ASME Certificate of Utility Boiler
ASME‘S’ , ‘U’ and NB stamp authorization