MOQ: | 1 Set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | Negotiation |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 20 Sets Per Year |
High Pressure HRSG Heat Recovery Steam Generator For Power Plant
Description
Along with sustainable development,recycling economy,energy conservation and low-carbon economy ideas put forward one by one.our cogeneration industry has experienced from scratch,small to large development process.
Cogeneration production process is converted waste heat to electrical energy technology.Cogeneration not only energy,as well as environmentally.Important cogeneration equipment room is HRSG.It uses gas,waste and other working fluid in the heat as a heat source or flammable substance,producing steam for power generation.As the working fluid temperature is not high,so the boiler bulky,consumed more than metal.Mainly used for high-temperature waste heat power.
Technical Parameter
Cement production line capacity t/d | 1000 | 2500 | 5000 | 10000 | |
Boiler inlet flow Nm3/h | Kiln(front) | 60000 | 88000 | 243000 | 472000 |
Kiln(tail) | 76000 | 170000 | 328000 | 612000 | |
Boiler inlet gas temperature℃ | Kiln(front) | 370 | 360 | 380 | 390 |
Kiln(tail) | 360 | 320~360 | 330 | 330 | |
Rated evaporation t/h | Kiln(front) | 5.8 | 7.25 | 24 | 50 |
Kiln(tail) | 7.5 | 10~15.8 | 20~24.6 | 35.5 | |
Rated steam pressure Mpa | Kiln(front) | 1.25 | 1.25 | 1.25 | 1.25 |
Kiln(tail) | 1.25 | 1.25 | 1.25 | 1.25 | |
Rated steam temperature℃ | Kiln(front) | 340 | 330 | 350 | 360 |
Kiln(tail) | 340 | 300~340 | 310 | 310 | |
Boiler structure | Kiln(front) | Vertical | Vertical | Vertical | Vertical |
Kiln(tail) | Vertical | Vertical and Horizontal | Vertical and Horizontal | Vertical |
Impact
Significant progress has been made in using the waste process heat in cement plants. But the use of this process heat to generate electricity fell during past years, which saw low and steady power prices. Times are changing. Deregulation is bringing the specter of extremely volatile electricity prices, loss of control over power costs, and the real likelihood that energy prices may increase in the near term in some areas.
Cerficate
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 200,000 square meters
2. 80 Engineers
3. 200 Coded welders
4. 30 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2015 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
MOQ: | 1 Set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | Negotiation |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 20 Sets Per Year |
High Pressure HRSG Heat Recovery Steam Generator For Power Plant
Description
Along with sustainable development,recycling economy,energy conservation and low-carbon economy ideas put forward one by one.our cogeneration industry has experienced from scratch,small to large development process.
Cogeneration production process is converted waste heat to electrical energy technology.Cogeneration not only energy,as well as environmentally.Important cogeneration equipment room is HRSG.It uses gas,waste and other working fluid in the heat as a heat source or flammable substance,producing steam for power generation.As the working fluid temperature is not high,so the boiler bulky,consumed more than metal.Mainly used for high-temperature waste heat power.
Technical Parameter
Cement production line capacity t/d | 1000 | 2500 | 5000 | 10000 | |
Boiler inlet flow Nm3/h | Kiln(front) | 60000 | 88000 | 243000 | 472000 |
Kiln(tail) | 76000 | 170000 | 328000 | 612000 | |
Boiler inlet gas temperature℃ | Kiln(front) | 370 | 360 | 380 | 390 |
Kiln(tail) | 360 | 320~360 | 330 | 330 | |
Rated evaporation t/h | Kiln(front) | 5.8 | 7.25 | 24 | 50 |
Kiln(tail) | 7.5 | 10~15.8 | 20~24.6 | 35.5 | |
Rated steam pressure Mpa | Kiln(front) | 1.25 | 1.25 | 1.25 | 1.25 |
Kiln(tail) | 1.25 | 1.25 | 1.25 | 1.25 | |
Rated steam temperature℃ | Kiln(front) | 340 | 330 | 350 | 360 |
Kiln(tail) | 340 | 300~340 | 310 | 310 | |
Boiler structure | Kiln(front) | Vertical | Vertical | Vertical | Vertical |
Kiln(tail) | Vertical | Vertical and Horizontal | Vertical and Horizontal | Vertical |
Impact
Significant progress has been made in using the waste process heat in cement plants. But the use of this process heat to generate electricity fell during past years, which saw low and steady power prices. Times are changing. Deregulation is bringing the specter of extremely volatile electricity prices, loss of control over power costs, and the real likelihood that energy prices may increase in the near term in some areas.
Cerficate
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 200,000 square meters
2. 80 Engineers
3. 200 Coded welders
4. 30 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2015 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization