Send Message
products
PRODUCTS DETAILS
Home > Products >
Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part

MOQ: 1 Set
Price: Negotiable
Standard Packaging: Iron Frame Package
Delivery Period: 50 Days
Payment Method: L/C, T/T, Western Union, D/P, MoneyGram
Supply Capacity: 800 Tons / Year
Detail Information
Place of Origin
Zhangjiagang,China
Brand Name
HD BOILER
Certification
ISO9001 , SGS , TUV , ASME , EN
Model Number
Boiler Header
Condition:
New
Structure:
Fire / Water Tube
Fuel:
Coal / Gas / Coal-fired / Water Heat
Type:
Boiler Part
Specification:
Customized
Pressure:
Low / High Pressure
Manufacturing Level:
A
Surface Treatment:
Painted
Highlight:

TUV Condensing Gas Boiler Header

,

CFB Condensing Gas Boiler Header

,

Steel Electric Condensing Boiler Header

Product Description

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part

 

Product Description

 

Boiler Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure.The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers.

 

 

Material

 

Natural gas industry Boiler Header can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.

The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.

Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

 

Technical Parameter:

Materials Stainless Steel
Type header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantages advanced welding, safe and reliable operation
Brand Jinan Yuanda
Remarks Customized order is also accepted.

 

Quality Control

 

1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part 0

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part 1

 

 

Company Introduction

 

Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

 

1. Fabrication area of 200,000 square meters

2. 80 Engineers

3. 200 Coded welders

4. 30 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2015 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization

 

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part 2

 

Design and Manufacturing capacity

 

Two automatic coiler production lines

Hot bending to minimum bending radius 0.6D

Membrane wall tube bending , with horizontal and vertical panel bending machines

Panel fabrication for up to for 1000MW power plant boilers

Fabrication of CFB Boiler Cyclone Separators

Fabrication of Header to Chinese standards(GB), US standards (ASME), or EU standard (EN)

Broad range of heat treatment equipment including 10 furnaces, offering normalizing and tempering

 

products
PRODUCTS DETAILS
Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part
MOQ: 1 Set
Price: Negotiable
Standard Packaging: Iron Frame Package
Delivery Period: 50 Days
Payment Method: L/C, T/T, Western Union, D/P, MoneyGram
Supply Capacity: 800 Tons / Year
Detail Information
Place of Origin
Zhangjiagang,China
Brand Name
HD BOILER
Certification
ISO9001 , SGS , TUV , ASME , EN
Model Number
Boiler Header
Condition:
New
Structure:
Fire / Water Tube
Fuel:
Coal / Gas / Coal-fired / Water Heat
Type:
Boiler Part
Specification:
Customized
Pressure:
Low / High Pressure
Manufacturing Level:
A
Surface Treatment:
Painted
Minimum Order Quantity:
1 Set
Price:
Negotiable
Packaging Details:
Iron Frame Package
Delivery Time:
50 Days
Payment Terms:
L/C, T/T, Western Union, D/P, MoneyGram
Supply Ability:
800 Tons / Year
Highlight

TUV Condensing Gas Boiler Header

,

CFB Condensing Gas Boiler Header

,

Steel Electric Condensing Boiler Header

Product Description

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part

 

Product Description

 

Boiler Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure.The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers.

 

 

Material

 

Natural gas industry Boiler Header can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.

The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.

Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

 

Technical Parameter:

Materials Stainless Steel
Type header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantages advanced welding, safe and reliable operation
Brand Jinan Yuanda
Remarks Customized order is also accepted.

 

Quality Control

 

1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part 0

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part 1

 

 

Company Introduction

 

Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

 

1. Fabrication area of 200,000 square meters

2. 80 Engineers

3. 200 Coded welders

4. 30 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2015 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization

 

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part 2

 

Design and Manufacturing capacity

 

Two automatic coiler production lines

Hot bending to minimum bending radius 0.6D

Membrane wall tube bending , with horizontal and vertical panel bending machines

Panel fabrication for up to for 1000MW power plant boilers

Fabrication of CFB Boiler Cyclone Separators

Fabrication of Header to Chinese standards(GB), US standards (ASME), or EU standard (EN)

Broad range of heat treatment equipment including 10 furnaces, offering normalizing and tempering

 

Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2025 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.